Leixlip Transfer Pipeline
Topograpical Surveying ProjectG2 have been appointed to carryout the topographical surveying for the Leixlip Transfer Pipeline and Wastewater Network Upgrade, as part of the non-intrusive site investigation. Surveying works commence in September 2016 and is currently ongoing. [Client: Irish Water]
-
N52 Cloghan to Billistown
Setting Out ProjectG2 are providing setting-out services on a part time basis for this 3.6km singly carriageway road project. [Client: Fox Contracts. Date: Aug 2016 ongoing]
-
Topographical Surveys
Topograpical Surveying ProjectG2 have carried out numerous topographical surveys for Architects and private individuals [for planning and design purposes] in the southeast region. The average turnaround time is 5 -7 days from confirmation to delivery of the CAD drawing.
-
N3 Belturbet to Butlersbridge
Setting Out ProjectG2 provided setting-out services on the 7km improvement scheme, N3 Belturbet to Butlersbridge. [Client: Ferrovial Agroman, Completion date: 2014]
-
National Childrens Detention Facility
Setting Out ProjectG2 had a full time presence on the National Children's Detention Centre in Oberstown. Services provided by G2 included setting-out for the civil and building works and as-built surveys for the €43M project [Client: BAM, Completion: 2015]
-
Bausch & Lomb Factory
Setting Out ProjectThe Bausch & Lomb development consisted of expansion of the existing facility in Co. Waterford. G2 successfully delivered site engineering services [setting-out & as built drawings] with a full time presence on site. [Client: BAM, Completion date: ongoing in 2016]
-
Smartlply Factory Waterford
Setting Out ProjectSite engineering services were provided by G2 on the €59M development of the Smartply facility in Belview Port, Waterford. The works included upgrade of the current infrastructure and building of a new Innovation Centre. [Client: BAM, Completion date: ongoing in 2016]
-
Court Houses
Setting Out ProjectSite engineering services were provided by G2 engineers on the refurbishment and extension projects for the courthouses in Wexford and Waterford. Total value of the projects combined was in the order of €50M. [Client: BAM, Completion date: ongoing in 2016].